  • Old Mutual Head Office commissioned SOLA Future Energy to build a 1 MW solar installation. Carried out in two separate phases, the solar system consists of a solar carport solution, as well as part of its West Campus building roof. The phases were completed in December 2016 and April 2017 respectively.

    Carports are uniquely positioned to assist with solar production. The solution at Old Mutual not only provides shade for the cars parking there during the day, but also harnesses the sun’s energy during peak radiation hours for use in the Old Mutual head office in Pinelands, Cape Town. The system, together with the rooftop installment, is expected to produce 2 203 668 kWh of electricity for the office park per annum.

    Around 6 – 8% of the office park’s electricity consumption will be provided by solar for the next 25 years. This should result in at least a R 3 712 880 monetary saving per year. With these savings in mind, the solar system will pay itself back in 5.5 years.

    Projects such as this demonstrate a simple step that large buildings can take toward securing their own energy supply in the future whilst cutting their own carbon emissions.

  • No Records Found

    Sorry, no records were found. Please adjust your search criteria and try again.

    Google Map Not Loaded

    Sorry, unable to load Google Maps API.

  • Overall Rating:
    rating iconrating iconrating iconrating iconrating icon

    1 Review on “1,3MWp carport installation at Old Mutual Head Office”

    1. Moenier Allie 1,3MWp carport installation at Old Mutual Head Office
      rating iconrating iconrating iconrating iconrating icon

      SolaFuture’s planning and execution of the Old Mutual carport PV installation was very good, and the solution was delivered as expected. Their communication and constant interaction with the Project stakeholders was exemplarily, resulting in a very easy project to manage.

      As anticipated and as with any project we were not spared of issues. We’ve experienced a few during the commissioning of the system, as well as panels shaken loose by erratic violent storm winds. SolaFuture were however very quick to respond and correct without jeopardizing the project timeline, quality of the product, and at no additional cost to the client, conforming to project scope. It was a pleasure dealing with such consummate professionals.

    Leave a Review

    Your email address will not be published. Required fields are marked *

    Rate this PV Installation (overall):
    • rating icon
    • rating icon
    • rating icon
    • rating icon
    • rating icon
     

    Drop files to upload


    Please drag & drop the images to rearrange the order